• Home

Examples of jobs that are not ready for template



This job is not ready for template



Reasons why this job isn't ready for template.

1) the sink is filled with dishes.

2) The faucet is mounted to the sub top and the waste line and dish washer are plumbed. To template and install a job with minimal chance for error and delay the sink needs to be sitting is the opening of the sub-top

3)The sink is not recessed into the sub-top.



This job is not ready for template



Reasons why this job isn't ready for template.

1) Items on sub-top. Sub-top area should be clear when when we arrive at the job.

2) The sink isn't in place mounted flush with the sub-top.



This job is not ready for template



Reasons this job isn't ready for template.

1) Items on sub-top, the sub-top must be void of all debris.

2) SInk is plumbed, the sink should be sitting lose in the sub-top without any plumbing attached.




This job is not ready for temblate



Reason this job isn't ready for template.

1) The sink is elevated above the plane of the sub-top. If the sink is sitting above the sup-top the sub-top should be modified to accept the sink. This type of sink ( cast sink ) requires r a carpenter to install the sink flush by making a frame or installing a sink setter bracket to hold the sink in place.